100A ORV3 AC Whip Cable (Right Angle)

Cart Image PN: ORV3-05AKDL-2000
Cart Image

ORV3-05AKDL-2000

0

Unit Price:
$0.00 TWD
Total Price:
$0.00 TWD

Lead time: 12 weeks (made to order). Minimum order quantity: 10. Non-cancellable / non-returnable (NCNR).

Backorder: please contact us to confirm availability and lead time before ordering.

JPC's 100A OCP ORV3 AC Whip Cable (Right Angle) delivers high-capacity three-phase power from the facility feed to Open Rack V3 power shelves. A compact right-angle ORV3 connector keeps the shelf end low-profile, and flexible single-conductor silicone leads route easily inside the rack. An IP67 IEC 60309 plug (4P5W, 6h) provides a sealed, rugged connection at the busway or tap box. RoHS compliant.

Key Features

  • 100A current rating at 240/415 VAC, three-phase, 60 Hz
  • Right-angle overmolded ORV3 connector for low-profile routing at the power shelf
  • Four flexible UL 2137 1 AWG silicone-rubber conductors (150°C) for easy in-rack routing
  • UL 2137 4C × 2 AWG jacketed cable to the plug, joined by an overmolded junction
  • IP67 IEC 60309 plug, 4P5W, 6h (red)
  • Built-in S1–S2 sense loop at the ORV3 connector
  • Four lengths from 2,000 mm to 4,600 mm

Specifications

Part Number ORV3-05AKDL-XXXX
Type AC Whip Overmolded Cable, Right Angle
Voltage 240/415 VAC, three-phase
Current Rating 100A
Frequency 60 Hz (current rating valid for 60 Hz AC sources only)
Conductors L1, L2, L3, PE (neutral not utilized)
Cable (connector side) UL 2137 DCPC-SS, 4 × 1 AWG single conductor, silicone rubber, 150°C
Cable (plug side) UL 2137 DCPC-RR, 4C × 2 AWG, 90°C, 500 mm
End A IEC 60309 Plug, 100A, 240/415 VAC, 4P5W, 6h, IP67
End B ORV3 100A Female Connector, Right-Angle Overmold
Connector Dimensions 110.2 × 74.5 × 40.8 mm
Compliance RoHS

Available Lengths

Part Number Total Length
ORV3-05AKDL-2000 2,000 mm
ORV3-05AKDL-3000 3,000 mm
ORV3-05AKDL-4100 4,100 mm
ORV3-05AKDL-4600 4,600 mm

Applications

  • High-Performance Computing (HPC) & hyperscale data centers
  • Scalable cloud infrastructure platforms
  • Telecommunications & edge computing
  • Power management & backup solutions

Installation Notes

  • The neutral terminal is not used. Do not connect loads that require a neutral conductor.
  • Switch on the tap-box circuit breaker only after the whip connector is fully mated with the power shelf connector.
  • Switch off the breaker before unplugging. Do not disconnect under load.

Resources

Frequently Asked Questions

A:

Yes, you can request product customization either directly through the product page or by leaving your information on our Contact Us page. We will reach out to you promptly.

A:

We accept Visa, Mastercard, American Express, PayPal, Google Pay, and bank transfer / offline payment. All online payments are processed in USD.

For bank transfer, or if you need a purchase order (PO), invoice, or other pre-payment documents, complete your order and contact us. Our customer service team will help arrange the transfer and provide instructions for your region. Established B2B customers can also ask about flexible payment terms.

A:

Lead times depend on stock status and are shown on each product page:

  • In stock: 7 business days.
  • Out of stock: 6-8 weeks, plus MOQ.
  • Made to order: 12 weeks, plus MOQ. Made-to-order items are non-cancellable and non-returnable (NCNR).

After an order has been dispatched, transit time varies by destination and carrier. For processing cut-offs, pickup, and international transit estimates, see our Shipping policy or Shipping Protocol page.

A:

We offer different shipping options with varying delivery times and prices. If you need a product urgently, you can reach out to us before you place orders, we will try our best to suit your needs.